Rhode Island oversize and overweight permits come from RIDOT's online permit system. A non-divisible single-trip permit has one statutory fee below a heavy-load weight line and a higher fee above it, plus a portal access fee. Big loads stay off freeways during weekday rush hours and holiday weekends.

By Haul Handbook editorial team· Updated Oct 4, 2026

RIDOT issues oversize and overweight permits online. Without a permit a Rhode Island vehicle may be 102 inches wide and 162 inches (13 feet 6 inches) high; a single vehicle may be 40 feet long and a semitrailer 53 feet, with semitrailers over 48 feet 6 inches limited to designated routes. Axles are capped at 22,400 pounds single and 36,000 pounds tandem, and gross weight follows the bridge formula up to 80,000 pounds. A non-divisible single-trip permit costs $40 under R.I. Gen. Laws § 31-25-21, and RIDOT's rate chart lists $300 at 130,000 pounds or more; an annual construction-equipment blanket permit costs $400. Escorts start at 12 feet wide, 80 feet long or a 15-foot overhang.

Width
8.5 ft§ 31-25-3 caps the total outside width of a vehicle or its load at 102 inches; the fine is $100 per inch over width.
Height
13.5 ft§ 31-25-4 caps a vehicle including load at 162 inches (13 feet 6 inches); the fine is $500 per inch over height. RIDOT says a permit over legal height may need a route survey, typically does on non-interstate routes over 13 feet 6 inches, and always does at 14 feet or higher.
Gross weight
80,000 lb§ 31-25-13 caps any single axle at 22,400 pounds (an axle load being all wheels between two parallel planes 40 inches apart). § 31-25-14 caps tandem axles spaced 8 feet or less at 36,000 pounds and applies the bridge formula W = 500[(LN/(N-1)) + 12N + 36] to any group of two or more axles, with an 80,000-pound overall maximum except under permit. Overweight fines are $125 per 100 pounds for axle violations, and under § 31-25-16 $125 per 500 pounds for gross violations on vehicles over 10,000 pounds, plus $1,025 above 104,800 pounds and $2,500 above 130,000 pounds.
Length: Single vehicle and load
40 ft
Length: Motor bus or motorized camper
45 ft
Length: Semitrailer in tractor semitrailer unit
53 ft
Length: Semitrailer without route restriction
48.5 ft
Length: Each trailer in double
28.5 ft
Length: Kingpin to rear axle center
41 ft
Length: Towaway trailer transporter minimum overall
82 ft

Axle weight limits

Gross weight is one ceiling; each axle group carries its own limit, and a load can be legal on gross weight yet overweight on an axle. Exceeding any of these needs an overweight permit.

Rhode Island legal axle weight limits by axle group
Axle groupMaximum weight
Single axle22,400 lb
Tandem axles spaced 8 feet or less36,000 lb
Any group of two or more axlesBridge formula W = 500[(LN/(N-1)) + 12N + 36], never above 80,000 pounds gross without a permit.
Gross vehicle or combination weight80,000 lb

Scroll sideways to see every column.

Permit fees

Single trip
$40 (R.I. Gen. Laws § 31-25-21(c) sets a $40 fee for each non-divisible single-trip permit. RIDOT's OSOW User Guide rate chart lists the statutory fee as $40 under 130,000 pounds gross and $300 at 130,000 pounds or more, plus an enhanced access fee kept by the portal operator: $4.50 on a sub-130,000-pound trip, and $12 (subscriber) or $20 (pay-as-you-go card or eCheck) on a heavier trip. A single-trip permit is valid for five days from the requested start date, a round trip needs a separate permit for each travel day, and every application is reviewed by RIDOT before issue.)
Annual permit
$400
Annual eligibility
The $400 annual blanket permit (§ 31-25-21(d) and (e)) covers intrastate moves of non-divisible construction equipment, boats or marine assets under 130,000 pounds, on a fleet of company-owned vehicles listed on the permit, at 55 to 80 feet overall length, up to 12 feet 4 inches wide, up to 25,000 pounds per axle and 130,000 pounds gross. It runs one year from issue, allows day and night travel on state highways, requires a flashing amber light above the highest point and red flags on all extremities, and may not be used over the Blackstone River Viaduct (I-295) or the Kingston Road bridge (I-95) or through lane-width reduction zones. Separately, Annual Divisible Load (ADL) permits let a single vehicle carry divisible loads above bridge-formula weight, overweight only and never oversize, expiring March 31 regardless of issue date.

Single-trip permit fee schedule

A single-trip permit stacks a base fee with a weight-tiered maintenance fee, and the heaviest loads add a supervision fee.

Rhode Island single-trip oversize permit fee components
Fee componentApplies toAmount
Non-divisible single-trip permit, under 130,000 lbs grossPer permit (valid 5 days)$40
Non-divisible single-trip permit, 130,000 lbs gross or morePer permit$300
Enhanced access fee, single trip under 130,000 lbsPer permit, any payment type$4.50
Enhanced access fee, single trip 130,000 lbs or morePer permit, subscriber account$12
Enhanced access fee, single trip 130,000 lbs or morePer permit, pay-as-you-go credit card or eCheck$20
Subscriber account annual billing feePer subscriber account per year$75

Scroll sideways to see every column.

To price a specific load, try the oversize permit cost estimator, or compare every state on the national oversize permit table.

To see how these fees combine on real loads, walk through Rhode Island oversize permit cost worked examples.

Escort thresholds

DimensionThresholdEscortsWhere the escorts ridePolice escort
width12 ft to 14 ft 6 in1Precedes the load on undivided highways and follows it on divided highwaysNot confirmed
widthover 14 ft 6 in2Not confirmedNot confirmed
length80 ft to 90 ft1Precedes the load on undivided highways and follows it on divided highwaysNot confirmed
lengthover 90 ft2Not confirmedNot confirmed
overhang15 ft or more1A second escort is required for a 15 ft or more rear overhang on a two-lane undivided highway when the load is 12 ft or more wideNot confirmed
heightover 13 ft 6 inEscort required (count set on the permit)Not confirmedNot confirmed
axle weight30,000 lbs or more on any axleEscort required (count set on the permit)Not confirmedNot confirmed
buildingany building move2Not confirmedPolice escort from each city or town on the route
craneintrastate crane move 12 ft wide or more2Not confirmedNot confirmed

What the escort itself has to be

Hitting the threshold is only half of it. The escort vehicle, its equipment, its driver's certification and where it rides are all regulated, and the carrier is the one holding the permit when they are not met.

General
Escort vehicles must be at least compact-car size, keep visual and two-way radio contact with the permitted vehicle, run flashing yellow lights above their highest point and low-beam headlights at all times. RIDOT's FAQ adds that a permit reviewer may require escorts whenever the circumstances call for it.
Bridges
For a permitted vehicle over 9 feet wide, the owner must arrange with police to halt traffic at one end of a bridge before crossing it.
Spacing and lanes
Oversize permitted vehicles traveling the same direction keep at least 1,000 feet apart, and loads over 12 feet wide use the right lane when two or more lanes are available.

Escort rules beyond the thresholds

Knowing when you need an escort is half of it. These are the Rhode Island rules on who may run one, what the vehicle has to carry, and how the move is conducted.

General
Escort vehicles must be at least compact-car size, keep visual and two-way radio contact with the permitted vehicle, run flashing yellow lights above their highest point and low-beam headlights at all times. RIDOT's FAQ adds that a permit reviewer may require escorts whenever the circumstances call for it.
Bridges
For a permitted vehicle over 9 feet wide, the owner must arrange with police to halt traffic at one end of a bridge before crossing it.
Spacing and lanes
Oversize permitted vehicles traveling the same direction keep at least 1,000 feet apart, and loads over 12 feet wide use the right lane when two or more lanes are available.

Conditions attached to every permit

The standing conditions Rhode Island writes into the permit itself, which apply whether or not they are printed on your copy.

Summary
The permittee indemnifies the State, is liable for damage to roads, signals and bridges, and must carry liability and property damage insurance sufficient for any claim; RIDOT may require a certified check, bond or other security where a move could damage highway facilities. RIDOT permits cover only state-maintained roads: the Mount Hope and Newport bridges need Rhode Island Bridge Authority permits and city or town streets need local permits. Permits and their documents ride in the vehicle. A carrier caught without a required permit or over its permit limits three times in a year loses permit privileges for up to 30 days, and up to 90 days for further violations; operating beyond a permit voids it.

Travel restrictions

Daylight only
Yes (290-RICR-40-00-1 section 1.5.8 allows most permitted vehicles on designated routes from 30 minutes before sunrise to 30 minutes after sunset, with no night travel except for overweight-only envelope vehicles able to keep up with traffic. Annual blanket permits are the statutory exception: § 31-25-21(e) makes them valid day and night on state highways.)
Curfews
Vehicles over 8 feet 6 inches wide, over 80 feet long or over 130,000 pounds may not travel on freeways and arterial roadways from 7:00 to 9:00 a.m. or 3:00 to 7:00 p.m., Monday through Friday (§ 31-25-21(f)(1)). Mobile or modular homes over 12 feet wide, construction equipment over 13 feet wide and cranes may travel on all of I-195 and on I-95 from the Massachusetts line to Route 37 only between sunrise and 7:00 a.m. and between 9:00 a.m. and 3:30 p.m. (290-RICR-40-00-1 section 1.5.8(B)).
Weekend / holiday
No Saturday, Sunday or Monday travel, day or night, on Memorial Day, Victory Day, Labor Day, Dr. Martin Luther King Jr. Day and Columbus Day weekends; no travel Wednesday through Sunday of Thanksgiving week; no day or night travel, and none the previous night, on Independence Day, Veterans Day, Christmas Day and New Year's Day; no Saturday night or Sunday travel at Easter (§ 31-25-21(f)(3)).
Wind / weather
No travel when road conditions, weather or visibility make it hazardous; a vehicle already underway must exit at the first available location and park until conditions improve (290-RICR-40-00-1 section 1.5.9). § 31-25-21(f) makes all permission to travel subject to weather and road conditions.
Daylight hours rule
290-RICR-40-00-1 section 1.5.8 allows most permitted vehicles on designated routes from 30 minutes before sunrise to 30 minutes after sunset, with no night travel except for overweight-only envelope vehicles able to keep up with traffic. Annual blanket permits are the statutory exception: § 31-25-21(e) makes them valid day and night on state highways.
Weekend
290-RICR-40-00-1 section 1.5.7 says permit travel is authorized Monday through Friday with no Saturday or Sunday travel 'under the agreement', language carried over from the New England Transportation Consortium procedures the rule adopts. The statute's holiday schedule and RIDOT's FAQ list only the holiday restrictions above; confirm weekend movement on the permit itself.
Weather
No travel when road conditions, weather or visibility make it hazardous; a vehicle already underway must exit at the first available location and park until conditions improve (290-RICR-40-00-1 section 1.5.9). § 31-25-21(f) makes all permission to travel subject to weather and road conditions.

Superload and beyond-permit review

Loads past the standard single-trip permit thresholds get individual state review rather than an off-the-shelf permit.

RIDOT requires an independent third-party analysis of every structure on the requested route for permit vehicles weighing 200,000 pounds or more, depending on route as RIDOT determines. The fee tier changes earlier: RIDOT's rate chart prices a single trip at 130,000 pounds or more at $300, and § 31-25-21(e) lets RIDOT approve a single-trip non-divisible permit above 130,000 pounds on application and good cause. 290-RICR-40-00-1 defines 'extra large vehicle or load permits' (moves beyond consortium limits) and requires those applications at least five working days ahead.

Gross weight lb
200,000
Regulation
RIDOT OSOW FAQs; 290-RICR-40-00-1 section 1.3(C)

More Rhode Island permit rules

Single trip fee
$40
Single trip fee note
R.I. Gen. Laws § 31-25-21(c) sets a $40 fee for each non-divisible single-trip permit. RIDOT's OSOW User Guide rate chart lists the statutory fee as $40 under 130,000 pounds gross and $300 at 130,000 pounds or more, plus an enhanced access fee kept by the portal operator: $4.50 on a sub-130,000-pound trip, and $12 (subscriber) or $20 (pay-as-you-go card or eCheck) on a heavier trip. A single-trip permit is valid for five days from the requested start date, a round trip needs a separate permit for each travel day, and every application is reviewed by RIDOT before issue.
Annual permit eligibility
The $400 annual blanket permit (§ 31-25-21(d) and (e)) covers intrastate moves of non-divisible construction equipment, boats or marine assets under 130,000 pounds, on a fleet of company-owned vehicles listed on the permit, at 55 to 80 feet overall length, up to 12 feet 4 inches wide, up to 25,000 pounds per axle and 130,000 pounds gross. It runs one year from issue, allows day and night travel on state highways, requires a flashing amber light above the highest point and red flags on all extremities, and may not be used over the Blackstone River Viaduct (I-295) or the Kingston Road bridge (I-95) or through lane-width reduction zones. Separately, Annual Divisible Load (ADL) permits let a single vehicle carry divisible loads above bridge-formula weight, overweight only and never oversize, expiring March 31 regardless of issue date.
Annual permit details: blanket construction equipment: annual fee
$400
Annual permit details: blanket construction equipment: covers
Non-divisible construction equipment, boats or marine assets under 130,000 lbs, intrastate, on company-owned vehicles
Annual permit details: blanket construction equipment: limits
55 to 80 feet overall length, 12 feet 4 inches wide, 25,000 lbs per axle, 130,000 lbs gross
Annual permit details: blanket construction equipment: enhanced access fee
$12 (subscriber) or $20 (pay-as-you-go) per permit
Annual permit details: annual divisible load: covers
Divisible loads (gravel, sand, liquids, refuse, logs and similar) above the bridge-formula weight; overweight only
Annual permit details: annual divisible load: fee
Rhode Island-registered vehicles: reflected in the registration fee under § 31-6-1(a)(2). Out-of-state vehicles: trailers $100 flat; single-unit trucks $50 per 1,000 lbs over the legal limit up to $1,500; tractors $50 per 1,000 lbs over the legal limit up to $1,250; transfer $10. Enhanced access fee $12, or 2% of the statutory fee plus $12 by pay-as-you-go credit card.
Annual permit details: annual divisible load: weight GVW lb by config: single unit two axle
legal weight only
Annual permit details: annual divisible load: weight GVW lb by config: single unit three or more axles
76,650
Annual permit details: annual divisible load: weight GVW lb by config: combination three axles
62,000
Annual permit details: annual divisible load: weight GVW lb by config: combination four axles
87,000
Annual permit details: annual divisible load: weight GVW lb by config: combination five or more axles
104,800
Annual permit details: annual divisible load: conditions
Expires March 31 regardless of issue date; the vehicle must be certified by its manufacturer for the braking and carrying capacity at the permit weight; each unit of a combination needs its own permit; the divisible-load bridge restriction list must be carried; window stickers are no longer required.
Escort notes: general
Escort vehicles must be at least compact-car size, keep visual and two-way radio contact with the permitted vehicle, run flashing yellow lights above their highest point and low-beam headlights at all times. RIDOT's FAQ adds that a permit reviewer may require escorts whenever the circumstances call for it.
Escort notes: bridges
For a permitted vehicle over 9 feet wide, the owner must arrange with police to halt traffic at one end of a bridge before crossing it.
Escort notes: spacing and lanes
Oversize permitted vehicles traveling the same direction keep at least 1,000 feet apart, and loads over 12 feet wide use the right lane when two or more lanes are available.
Seasonal permits note
RIDOT offers no seasonal or harvest permit; its three permit types are the single-trip non-divisible permit, the annual construction-equipment blanket permit and the Annual Divisible Load permit (April 1 to March 31). Local authorities may by ordinance restrict vehicle weights on their own roads for up to 90 days a year when weather or deterioration threatens the road, once signs are posted.
Permit conditions: summary
The permittee indemnifies the State, is liable for damage to roads, signals and bridges, and must carry liability and property damage insurance sufficient for any claim; RIDOT may require a certified check, bond or other security where a move could damage highway facilities. RIDOT permits cover only state-maintained roads: the Mount Hope and Newport bridges need Rhode Island Bridge Authority permits and city or town streets need local permits. Permits and their documents ride in the vehicle. A carrier caught without a required permit or over its permit limits three times in a year loses permit privileges for up to 30 days, and up to 90 days for further violations; operating beyond a permit voids it.
Statute
R.I. Gen. Laws § 31-25-21
Statute note
Legal dimensions and weights are in R.I. Gen. Laws chapter 31-25 (§§ 31-25-3 to 31-25-7, 31-25-13 and 31-25-14). RIDOT's permit power and the single-trip and blanket fees are in § 31-25-21, divisible load permits in § 31-25-22, and permit conditions in § 31-25-23. RIDOT's procedures are 290-RICR-40-00-1, refiled without text changes effective January 4, 2022; parts of that text (the $20 trip fee and $100 blanket fee in section 1.4.4, and applying at the DMV) predate the current statute and online system.

The Rhode Island permit office

Agency
RIDOT Oversize & Overweight Division
Phone
(401) 563-4582
Email
DOT.OSOW@dot.ri.gov
System
RIDOT OSOW Permit Portal (osowpermits.dot.ri.gov; the ri.gov/DOT/osow address printed in RIDOT's guides redirects there)
Portal support
Questions about the online service, payments, subscriptions and logins go to the portal operator at rihelp@egov.com or (401) 831-8099; that line belongs to the online-service vendor, not the permit reviewers.
Accounts
Pay-as-you-go accounts open instantly online and pay by credit card or eCheck. Subscriber accounts (for permit services and fleets) take 3 to 5 business days to set up, allow up to 10 users, are invoiced monthly net 30 by check or ACH only, and pay an annual billing fee, currently $75.
Note
290-RICR-40-00-1 section 1.4 still names the Division of Motor Vehicles at 600 New London Avenue, Cranston as the place to apply, and a $20 trip fee; both are superseded in practice by the RIDOT online system and by the $40 statutory fee in § 31-25-21(c).

Width and height are capped by statute including the load, with fines charged per inch over. Length depends on the configuration: single units, semitrailers, longer semitrailers limited to the Interstate and designated roads, and twin trailers each have their own limit, and loads may hang a set distance past the front and rear.

Axle loads, the bridge formula and a gross cap govern weight, and Rhode Island's tandem limit sits above the common figure. Overweight fines climb with every increment over the axle and gross limits.

What permits cost

R.I. Gen. Laws § 31-25-21 sets the single-trip fee, and RIDOT's rate chart adds a higher tier for the heaviest loads. The portal operator keeps a separate enhanced access fee on each permit, which depends on the weight tier and on whether you pay as a subscriber or by card or eCheck. Subscriber accounts also pay a yearly billing fee.

The construction-equipment blanket permit has a flat yearly price. Annual Divisible Load fees for Rhode Island trucks are built into the registration fee, while out-of-state trucks pay a flat trailer fee or a charge for each block of weight over the legal limit, up to a cap.

Escorts

Escort counts follow width, length and overhang bands set in RIDOT's rule, with two escorts at the widest and longest bands. Height above the legal limit and very heavy axle loads also call for an escort, with the count set on the permit, and a reviewer can add escorts whenever conditions call for it.

Building moves need two escorts and a police escort from each city or town on the route. Escort vehicles run flashing yellow lights and headlights and keep radio contact, and for wider loads the owner arranges police to halt traffic before a bridge crossing.

When permitted loads can move

Most permitted loads move in daylight only, from shortly before sunrise to shortly after sunset. Wide, long or very heavy loads stay off freeways and arterials during weekday morning and afternoon rush hours, and wide mobile homes, construction equipment and cranes get narrower windows on I-195 and part of I-95.

Holiday blackouts cover the long weekends around Memorial Day, Victory Day, Labor Day, Martin Luther King Jr. Day and Columbus Day, most of Thanksgiving week, and several single holidays. The blanket permit is the exception that allows night travel on state highways.

Restricted bridges and superloads

The Washington Bridge on I-195 in Providence carries a reduced weight limit and bars oversize vehicles until RIDOT's posted end date. The blanket permit cannot be used over the Blackstone River Viaduct on I-295, the Kingston Road bridge on I-95 or through lane-narrowing work zones.

The heaviest moves need an independent analysis of every structure on the route, and extra-large loads must be applied for several working days ahead.

How to read this page

A value reading "Not confirmed" means we could not verify the figure on an official agency page at review time, so it stays open rather than guessed. Superload moves above the standard permit thresholds get individual review by the state; contact the permit office named on this page. For the rest of the Rhode Island permit stack, see Rhode Island trucking permits.

Frequently asked questions

How long is a Rhode Island single-trip permit good for?

A single-trip permit is valid for a short window from the requested start date, and the exact period renders with the permit fee. A round trip needs a separate permit for each travel day, and RIDOT reviews every application before it issues.

When does a Rhode Island oversize load need an escort?

When it crosses the width, length or front or rear overhang bands in RIDOT's rule, when it is over legal height, or when any axle carries a very heavy load. Building moves always need escorts plus police from each town on the route.

Can I move an oversize load on a weekend in Rhode Island?

Check the permit. The statute bans travel on the listed holiday weekends and most of Thanksgiving week, while RIDOT's procedure rule still says permit travel runs Monday through Friday. Follow the travel days printed on your permit.

What is an Annual Divisible Load permit?

A yearly RIDOT permit that lets one truck carry divisible loads such as gravel, sand, liquids, refuse or logs above the bridge-formula weight. It is overweight only, never oversize, and every permit expires on the same spring date whatever its issue date.